
MEP and fit-out fail on sequencing more than on skill. Our value is having both trades under one supervisor, so the ceiling grid and the ductwork are not two companies blaming each other.
Ductwork fabrication and installation, HVAC plant, pipework, pumps, insulation, testing and balancing.
Containment, cabling, terminations, distribution boards, lighting, small power, testing and commissioning.
Water supply, sanitary installation, drainage, pressure testing and commissioning.
Partitions, bulkheads, suspended and acoustic ceilings, access provision and detailing.
Fixed and loose joinery, doors and ironmongery, vinyl, carpet, tile and stone flooring.
Preparation, spray and brush application, specialist coatings and snag-free handover.




Standard trades already in Qatar, documented and medically cleared. Certified specialists 2–4 weeks; overseas 6–8 weeks.
Rejected on trade competence in the first seven days? Replaced without any additional charge to you, and without argument.
A written rate schedule on the day we receive a complete requisition. Not a callback, a rate.
A named account manager, and an operations line staffed outside office hours. Sites do not stop at five.
Send the trade, the headcount, the site and the start date. You get a rate schedule back, not a brochure.